Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Landslide hits traffic on highway near Kumarhatti

Boulders, soil fall on road, block access to some flats also
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
Vehicular traffic disrupted on NH-5 near Kumarhatti.
Advertisement

Traffic was partially disrupted after a massive landslide occurred near Kumarhatti on the Kumarhatti-Solan stretch of the National Highway No. 5 on Monday afternoon.

A large quantity of soil and boulders fell down the hill, blocking access to some flats located uphill.

The National Highways Authority of India (NHAI), which has four-laned the highway, directed the contractor concerned to rush labourers and machinery to the site to clear the debris.

Advertisement

Project Director, NHAI, Anand Dahiya said traffic had been hit on one lane while the other portion of the highway was open to vehicles. He said the road would be cleared by Tuesday as a large quantity of debris had fallen on it.

Notably, a similar landslide had occurred near the site last year too.

Advertisement

Though repair work was undertaken by a private contractor, the hilly slope has once again eroded following rain in the area.

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Home tlbr_img2 Opinion tlbr_img3 Classifieds tlbr_img4 Videos tlbr_img5 E-Paper