Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Construction of road begins

Panchkula, September 19 Construction of the 2-km road in front of the Haryana Roadways bus depot in Industrial Area, Phase 2, was launched by Haryana Assembly Speaker Gian Chand Gupta. Gupta said the road would be constructed at a...
  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

Panchkula, September 19

Construction of the 2-km road in front of the Haryana Roadways bus depot in Industrial Area, Phase 2, was launched by Haryana Assembly Speaker Gian Chand Gupta.

Gupta said the road would be constructed at a cost of Rs 70 lakh and completed within 15 days. He directed the officials of the Municipal Corporation to ensure the use of quality material in the construction of the road.

Advertisement

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Home tlbr_img2 Opinion tlbr_img3 Classifieds tlbr_img4 Videos tlbr_img5 E-Paper